This isn't news 'per se' as I've had this casting for some time and in fact have machined it but since it's now appeared in the log that I'm slowly copying across to this blog I'll include it in the 'news' section now. I'll do the same as other out sourced parts appear in the log.
This is the ejector elbow as supplied by Adam (Cro Fittings) It was very kind of Adam to draw this up for me when he did. I had reached the stage where I needed it and within a couple of days Adam how drawn it up and then sent to Mike Jack for printing/casting. Also included are the hoop rings that hold the ejector vacuum pipe along the side of the boiler. So a big thank you to Adam.